Friday, November 6, 2015

Another milestone reached

Last evening finished sewing on last border. The blue border is growing on me. This quilt will take a rest and plan on hand quilting it late spring early summer. Very pleased how it looks.





Sunday, September 20, 2015

Another milestone...blocks completed

Finished the last shoo fly block today. Laced it out and now have it in rows to sew. We will see how long this step takes. Maybe I can have it ready to hand quilt in Arizona.





Monday, September 14, 2015

Humble Quilts: Country Roads Mystery Quiltalong Part 1

Humble Quilts: Country Roads Mystery Quiltalong Part 1:  In case you missed it, HERE is the requirements for Country Road Mystery Quiltalong .  Your blue strip is going to be a bit longer t...

Friday, September 11, 2015

Next milestone reached today

I have been working on these small blocks and today got all the triangles sewn. So just have about 60 something shoo fly blocks to sew.

Sure look forward to completing this quilt. The small blocks are so cute.


Sunday, August 16, 2015

Shoo fly block # 52 completed

Have reached the 52 block mark, so about half way thru. Noticed I repeated 2-3 fabrics. Need more blue, greens and links to balance other colors. I might get them done prior to AZ so could sew rows on the drive down.


Wednesday, May 6, 2015

Next set of blocks and glimpse of the final result

Incompleted 10 blocks and just wanted to see a glimpse of the final result...so worth the time and effort.



Wednesday, April 29, 2015

Catch up on "Ohmygosh" quilt progress

My plan was to do these during our drive to Az, but I did not. I however did them in Az, but it was my last hand quilting project that I brought along. It took me about a week and a half. I did a lot of them poolside, balcony sitting or watching the the basketball games to the final four. Badgers made it to the final four, but lost...heart breaking.
I did think I was short a few blocks and when I got home I counted them and was short 7 blocks. So the last two days I finished the 7 blocks. I have been working on the the next step and am about 3/4 done of 446 blocks...mini 4 patches. So overall this quilt is coming along. Such a great project to do while watching/listening to TV.

I have heard this is a heavy quilt with all the pieces. So I am thinking I may just get some funnel and use that as the backing without batting. Then a simple quilting sitch. Als have some work shirts that I will use in the quilt with the half squares. Will try to use blues I think for that section. This is my hand sewing project so would like to take it down to AZ next winter/spring to work on. Not in favor of bring a sewing machine down that year.


Part one of block two

I began sewing these small four patches around the beginning of April. Just completed them yesterday and squared up the few final blocks. Now I will be ready to sew the four triangles to them and trim to 2 inches. I have decided to first do the shoe fly blocks those triangles in groups of ten and then see the four triangles to the four patches. This will give a bit more sewing variety. I however have several quilts waiting to be hand quilted so I may let this one rest a bit to do those. It is a good hand sewing project in the evening with Whiskers on my lap, so we will see. Here is a progress picture.


444 small blocks!

Tuesday, February 17, 2015

First step done..now to next step

Just finished all 525 small blocks all pressed and trimed. Now starting the next step. We will see how many I get done during car ride to Arizona and back.

This will be a cute quilt but will take some time to do it. It also is a lot of fun.

Friday, January 30, 2015

3rd 100 blocks pressed and trimes

Here are the cute blocks, the next 100. That makes the total up to 300. They are so cute when trimed.